Search
X Announcement Heading

Announcement Description for global announcement

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Catalog

Intelligent Completions

Technologies from reservoir engineering studies to advanced completion design, zonal isolation, and flow control

Article

Nominating and Corporate Governance Committee Charter

The Nominating and Corporate Governance Committee of the Board of Directors of Halliburton Company is composed of a minimum of three independent directors.

Case Study

Seneca boosts efficiency with RapidStage® ME sleeves

Seneca boosts ERL efficiency using RapidStage® ME sleeves, cutting cycle time, reducing costs, and eliminating drill outs in challenging completions

iCruise® RSS EarthStar Service - Case Study

SentinelCem™ Cement - Data Sheet

Case Study

Operation restored with retrofit pump solution

A Permian Basin Operator contacted Summit ESP® to help fix two different surface pump units at one of its saltwater disposal (SWD) facilities in West Texas.

Case Study

Wintershall Dea sets company record at Maria Field

Engineered drilling solution and combined expertise from Halliburton, Wintershall Dea, and Seadrill helps achieve goal of drilling one mile in 24 hours.

Article

IsoLatch™ Cement Wiper Plugs - Data Sheet

Single-latch casing wiper plugs for reduced risk, improved fluid separation, and wet-shoe operations.

SureDscale™ C - Data Sheet

Results per page: 102550