Search
X Announcement Heading

Announcement Description for global announcement

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Razor™ Shaped Cutter

Lube Oil Flushing - Data Sheet

Case Study

Tubing water shutoff solution improves productivity

The RELAY™ Digital Slickline helped an operator, located in Algeria, increase oil production and reduce water cut by 21% and improve well productivity.

Case Study

Operator controls major loss event in Gulf of Mexico

Halliburton's BaraBlend®-680 lost circulation material helped salvage the well, reduce losses, and move to the production zone while saving over USD $1M.

Data Sheet

MRIL®-Nuclear Magnetic Resonance - Data Sheet

Veto™ 3 Subsea Safety Tree - Data Sheet

Case Study

RapidStage system with AccessFrac service in the Bakken

RapidStage system using Swellpacker isolation system - two discrete fracture treatments in a stage can be achieved by introducing AccessFrac in Williston Basin.

Case Study

Santos adopts engineered solution to avoid stuck pipe incident

Customized drilling fluid increases ROP, saving 1.5 hours of rig time per vertical well, reduces safety exposure, and lowers well cost by USD 600,000.

Case Study

Wellbore cleanout saves customer in Angola 18 Million USD

Halliburton operation helps a customer avoid 90 days of deferred production and a coiled-tubing intervention and saves USD 18 million in Malongo, Angola.

Oilfield Technology: Hole in One - Article

Results per page: 102550