Search
X Announcement Heading

Announcement Description for global announcement

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

Solving friction reduction devices interference

Discover how Halliburton's QuickPulse™ tackles downhole data challenges in a two-mile reservoir, further enhancing drilling efficiency in the Permian Basin.

Case Study

Summit ESP® customer service delivers in harsh condition installation

Logistical planning grows imperative in the facing of harsh conditions with remote locations, making the mistakes incredibly costly in the field of work.

Case Study

100% recovery of a 450-foot core in a single run

Halliburton recovered 450ft of continuous formation in a single run, breaking a record in North America. The team provided 100% recovery of desired core length.

Data Sheet

SurgiFrac® Service

Precise multi-stage stimulation with SurgiFrac®, offering well dynamic diversion, boosting treatment rates and environmental efficiency

Case Study

Improving ROP performance in 12-1/4” section

Halliburton enables an operator in Texas to achieve faster drilling with improved rate of penetration performance in the 12-1/4” intermediate section.

Case Study

GOM operator lowers deepwater drilling days & campaign costs

Sperry Drilling multi-discipline collaboration and analysis helps improves well delivery time by roughly 24% and reduces drilling costs in Gulf of Mexico.

Data Sheet

CobraMax® service - Data sheet

CobraMax stimulation service provides the performance of conventional through tubing fracturing with the speed and versatility of coiled tubing operations

Case Study

CrystalSeal® service in WAG injection well

Discover how Halliburton's CrystalSeal® bullheaded into the WAG injection well. Two stages were deployed until a significant pressure response was achieved.

Case Study

H2Zero® conformance service acheived longer treatment life

Conventional cement vs. H2Zero® Conformance service (deep reservoir penetration). Longer treatment life was achieved with H2Zero® conformance service.

Case Study

Gulf of Mexico operator geosteers slim hole 100% in pay zone

Discover how Geo-pilot® RSS technology helped extend reservoir length 212% more than expected, staying 100 percent in zone in the shallow of the Gulf of Mexico.

Results per page: 102550