Search
X Announcement Heading

Announcement Description for global announcement

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Data Sheet

Rig audit - data sheet

Conducted during the actual operations phase, after rig up and before rig down, allowing real-time assessment between people, paper, and processes.

Case Study

Onsite wastewater treatment solution saves operator $280,000

Oxidation solution increased wastewater treatment efficiency at the plant and eliminated the need for more expensive offsite hazardous waste treatment options.

Case Study

SmartFleet® monitors parent-child simul-frac behavior

Parent-Child monitoring in fracking success with the help of SmartFleet® Cross-Well monitoring service and ExpressFiber™ disposable fiber service campaigns.

Case Study

LWD caliper and drilling mechanics reveal distinct characteristics of geothermal well formations

Advanced technology enables operator to assess and mitigate problematic well conditions previously encountered in the region

Case Study

SmartFleet® diagnoses fracture geometry during simul-frac

Disposable fiber used to diagnose fracture geometry & monitor stimulation growth allowed the operator to see, measure, and act on subsurface fracture behavior.

Case Study

Boots & Coots establish control of well after blowout during workover operation

Discover how Halliburton's Boots & Coots team contains well in emergency situation without incurring any injuries during an operation in South America.

Case Study

420 Corsair motor improves drawdown in tight clearance wells

Halliburton's 420 Corsair EMS motor coupled with Tiger Shark® TS3 pumps provided the power needed to increase drawdown by 12% and total fluid production by 15%.

Case Study

New quantifiable operational rig audits lead to improvements

Boots & Coots well control audits help major operator improve safety and efficiency, reducing exposure to well control events and increasing audit scores 22%.

Case Study

Boots & Coots achieve execute well for blowout resolution

Discover how Halliburton's multidisciplinary response resolved a catastrophic blowout crisis in the first attempt in an Indonesian well with no incidents.

Case Study

Successfully Delivered First Integrated P&A Under-River Well Project - Case study

Multi-group Halliburton team executes plug and abandonment (P&A) operation in complex and remote Colombian environment.

Results per page: 102550