Search
X Announcement Heading

Announcement Description for global announcement

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

North Sea Operator Trials Innovative P+A Barrier Verification with Potential Savings of 34 Hours Rig Time

Halliburton Installs 300th FlexRite® System, Including Over 100 FlexRite MIC Junctions, In North Sea

FloRite® Multilateral Completion System - Data Sheet

Standalone Early Production Facility Handles 6,000 BPD and 5 MMscfd Capacity for Petrofac’s Santuario 400 Field

Cyclic Steam Injection (CSI) Pilot Design

Operator Saves 21 Hours on Two Extended-Reach Horizontals in the Bakken Field

Single Trip SPECTRUM® Services for Completion Design Evaluation

Williston Basin Operator Increases Drilling Efficiency Via Intelligent Bit Technology

GeoBalance™ Managed Pressure Drilling Service Cuts Drilling Time in Half

Operator Proves Cost Savings With LWD High-Resolution Imaging Service

Results per page: 102550