Early production facility supports Aullador-1 oil well
Engineered solution works to deliver efficent impementation of modular EPF layout while using the existing equipment and running four years of zero NPT.
Case Study
Operator saves with Geo-Pilot® XL RSS and underreamer
$500,000 USD and 61 hours saved using Geo-Pilot xl rss combined with underreamer engineered solution in a heterogenus formation to reduce the well time.
Data Sheet
Storm Choke™ H Safety Valve Data Sheet
Case Study
Operator diagnoses root cause of back pressure in pipeline
Halliburton's Innervue pipesuite diagnostic service eliminates the need for having intrusive tools to gather pipeline profile data for operator in India.
Case Study
CleanWell® test packer breaks record for single trip solution
Operator uses CleanWell® inflow tech showcases a test packer and breaks records for a single trip solution in the Gulf of Mexico with a $1.8 million USD.
Summit ESP®’s MineESP™ submersible pumps excel in controlling groundwater inflows, minimizing downtime, and enhancing mine productivity in challenging environments.
Case Study
Solution maximizes drilling in pre-salt carbonate formation
Engineered solution maximizes drilling in pre-salt carbonate formation, saving USD 833k advanced turbine drilling solution increases rop and reduces well time.
Case Study
2M USD and 48 hours saved from RSS and At-Bit Reamer
Discover how Halliburton's engineered drilling solution, Geo-Pilot® Dirigo™ RSS with TD Ream® Tool, eliminates extra rathole run in the Gulf of Mexico.