Search
X Announcement Heading

Announcement Description for global announcement

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

Operator avoids wellbore damage with real-time data insights

A record 75 cemented Datasphere® Array quartz gauges + fiber optics provide far-field monitoring for well space out and frac optimization in Permian Basin.

Case Study

EV0-Trieve™ RBP successfully recoverd after well shut-in

Operator required installation of a temporary intervention downhole well barrier in a gas well. Halliburton provided an EV0-Trieve RBP for barrier provision.

Case Study

Successful liner installation in deepwater well with narrow operational window

A combination of SuperFill™ II Big Bore float collar and SuperFill™ II diverter enabled RIH with 18-in. liner through a narrow operational window.

Case Study

Expandable liner hanger system for floated liner applications

VersaFlex® XSL expandable liner hanger and ball-set running tool provide a pressure-balanced, engineered system tailored for floated liner applications

Data Sheet

SandTrap® XL sand consolidation service - Data sheet

Externally activated resin system that provides consolidation strength to the formation grains, while preserving the original permeability of the rock.

Case Study

Formation pressure testing service improves reservoir knowledge

GeoTap® IDS formation pressure testing service provides key information to understand reservoir compartmentalization in deviated well and reduces rig time.

Case Study

Successful installation of VersaFlex® Big Bore system in egypt extends deepwater envelope

An operator had a challenging well design for an exploratory high-pressure/high-temperature (HP/HT) well located in deep water in the Mediterranean Sea.

Case Study

XtremeGrip™ system offers metal-to-metal solution for complex deepwater well

An operator needed a liner hanger to reliably run a production liner for their complex deepwater well. The XtremeGrip™ system was up for the challenge.

Article

POWER Magazine - Increase Geothermal Production with Deeper Casing Depths

Ideal conditions for geothermal power can create some of the biggest cementing challenges for wells. Where traditional cementing methods fail, tailored cement formulations and processes can help run casing deeper and lower geothermal well costs.

Case Study

New emulsion breaker reduces treatment and transportation costs

Specialized technology saves operator approximately $28 million annually

Results per page: 102550