Search
X Announcement Heading

Announcement Description for global announcement

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Data Sheet

Skidding system hydraulic workover structure - Data sheet

The Halliburton engineered skidding system design with access stairs enables skidding of hydraulic workover (HWO) units, improving safety in drilling projects.

Case Study

Integration reduces days per well in offshore environment

Halliburton multiskilled team drives performance to deliver integrated P&A campaign, achieving successful barrier integrity and no NPT or HSE incidents.

Case Study

Slimline pump for irrigation well successfully deployed

Halliburton's Submersible pump for irrigation well enabled the customer to successfully produce the irrigation well and get much-needed water for its crops.

Case Study

Operator saves $8.1 million, using PowerMag® casing magnet

Read insight on how Halliburton works with operator to save $8.1 million USD using a casing magnet to successfukky tackle a wellbore cleanup in Asia Pacific.

Case Study

Operator saves USD 3.4 million in presalt drilling

Comprehensive drilling solution includes the following: front planning and modeling, real-time monitoring, and the Geo-Pilot Duro RSS with advanced features.

Case Study

Petroindependencia drills longest ERD well in target zone

Geo-Pilot Dirigo RSS reduces well time by three days in an extended-reach well by drilling field’s longest lateral in 3 days while staying in the sweet spot.

Data Sheet

Versa-Set® Retrievable Packers - Data Sheet

Data Sheet

The Xaminer® hostile formation tester (XHT) service

The Halliburton Xaminer hostile formation tester works to help eliminate the risk in the environments that are labeled high pressure and high temperature.

Data Sheet

Well intervention pumping services and equipment - Data sheet

Halliburton, a trusted industry leader, offers pumping solutions backed by extensive experience and cutting-edge equipment, ensuring reliable performance.

Case Study

Use of remotely operated technology saves 59 hours rig time

The use of eMotion-LV valve and Evo RED bridge plug saved an operator in the North Sea approximately 59 hours rig time compared to typical intervention methods.

Results per page: 102550