Search
X Announcement Heading

Announcement Description for global announcement

Discover resources from Halliburton

Showing 1-10 of 228 results

Results per page: 102550
Filtered results

Case Study

CleanWell® solutions help operator to clean up ERD well

Halliburton's CleanWell® solutions deliver cost-efficient cleanup with no HSE issues or NPT for a complex extended-reach-drilling well in Sakhalin, Russia.

Case Study

Drilling Gulf of Thailand’s longest openhole section

Discover how Halliburton's Quasar Trio® M/LWD triple-combo service reduces 8 hours of overall well time in extreme-temperature well in the Gulf of Thailand.

Brochure

Ingrain Laboratories

Advanced rock analysis for the oil and gas industry, providing pore-level insights for reservoir optimization

Data Sheet

Cerebro® electronic data capture system - Data sheet

The Cerebro® electronic data capture system gives the industry’s best high-speed look at data from the bit.

Brochure

DeepSure℠ certified products - Brochure

Multi-Chem has a full line of DeepSure℠ certified products for integrity management, flow assurance, and production enhancement

Case Study

Single-trip multizone frac packs and completions improve recovery

A nine-well subsea development project was completed with Halliburton cased-hole frac packs for sand control & multizone intelligent completion technology

Case Study

Integrated operation saves operator five hours of rig time

Halliburton’s single-trip P&A solution in Norway saved 5+ rig hours by combining cementing, BOP jetting, and riser cleaning in one efficient operation

Case Study

N-FLOW™-325 breaker system increases production by 30% in oil field

N-FLOW™-325 breaker system boosts an oil production in Venezuela by 30 percent all while preventing precipitation of asphaltane and emulsion blocking.

Data Sheet

H2Zero™ - Data sheet

Halliburton’s H2Zero™ service uses a revolutionary polymer system to provide unprecedented capabilities for controlling unwanted fluid production.

Case Study

Dual casing peforate, wash, and cement saves 66 hours

Successful dual-casing well abandonment with PWC technology saves 66 hours of rig time, mitigates HSE risks, and saves over USD 240,000 in the Netherlands.

Results per page: 102550